Albury Hume Freeway

RTA

Senior Project Engineer. 800t railway bridge constructed on and adjacent to live railway over an existing road. Tight timeframe requiring innovative construction methods and temporary works.
130m long tendon stayed composite steel / concrete pedestrian bridge constructed over live railway.
Rail track works, level crossing removal, rail signalling design and installation. Demolition of bridges in the rail corridor.